Kin Kin
Engaged at design stage, before any builder quote existed. An early Foundation cost position gave a real benchmark to test pricing against, and a follow-up Realignment engagement reconciled the builder’s number against it once pricing came in.

Stage engaged
Design, pre-pricing
Service
Foundation + Realignment
Outcome
Contract-ready with a reconciled position
The challenge
A secondary dwelling on a sloping, reactive block was still at design stage, with no builder pricing yet in hand. The site itself carried real structural cost drivers — a stiffened raft and pad footings rather than a standard slab — that needed to be understood and costed before any quote could be sensibly judged.
Our approach
We started with a Foundation engagement, working from the design documentation available at the time, to establish a defensible cost position ahead of any builder pricing. Once a builder quote did come in, we moved to a Realignment engagement to reconcile it against that benchmark — working through where the gap sat and what was driving it — alongside a review of what documentation was still needed before signing.
The outcome
The owner moved into contract signing with a real cost benchmark already established, a reconciled position on the builder’s pricing, and clarity on the documentation gaps that needed closing first — rather than discovering any of it after the contract was signed.